IFAN GroupIFAN Group
Return to Briefings
PPR

Importing PPR into Ghana: GSA Conformity and the Tema Clearance Sequence

Transmission Date09/05/2026
Importing PPR into Ghana: GSA Conformity and the Tema Clearance Sequence

Ghana Standards Authority rules for PP-R pipe: EasyPASS routes, which standard your certificate names, the Tema ICUMS clearance order and 2026 charges.

Your container of PP-R is booked for Tema and the forwarder wants to know which conformity certificate travels with it. Ghana inspects at destination, but the document that clears the goods is issued at origin, before loading, under the Ghana Standards Authority's EasyPASS programme, and since 1 July 2026 applications go directly to the Authority. Construction materials are a regulated category, so plan on a Certificate of Conformity and start it while the pipe is on the factory floor.

PP-R carries one extra complication. Ghana has adopted national standards for PVC-U pressure pipe and, in the most recent catalogue GSA publishes openly, none for polypropylene hot and cold water pipe. That decides what the certificate can name.

Key Takeaways

  • EasyPASS is the live scheme. The older G-CAP had its 1 October 2014 start deferred by public notice, so a supplier offering a “G-CAP certificate” is quoting a programme that never commenced.
  • Verification happens in the region of export, prior to shipment. A Certificate of Conformity is not something a clearing agent can obtain at Tema after the vessel berths.
  • The Catalogue of Ghana Standards 2019 lists GS ISO 1452-1:2009 through GS ISO 1452-5:2015 for PVC-U pressure pipe and no PP-R hot and cold water standard. Your test report should cite ISO 15874 with its year and amendments.
  • The 1% COVID-19 Health Recovery Levy was repealed by an Act assented 10 December 2025. Any Ghana landed-cost sheet still carrying it predates 2026.
  • No factory holds a standing Ghana CoC. It is issued per consignment, against the SKUs on that invoice.

Amendment 2:2022 to ISO 15874-2 added the impact test, and the clip below is that class of test run on PP-R pipe on our own line: a length struck to see whether it cracks. It is the bench evidence a conformity file is assembled from, and it is worth a minute before the standards section below.

IFAN PPR Pipe Whipping Impact Test, a PP-R pipe struck under test to check that it does not crack ▶  Play

IFAN PPR Pipe Whipping Impact Test. The 2022 amendment to ISO 15874-2 is the impact test, so this is the class of result a competent-laboratory report for PP-R is expected to carry.

What GSA Requires Before Your Container Sails

GSA has been the competent authority for import conformity since 2003, and its import-inspection procedure asks four things: register with GSA, buy the applicable Ghana Standard, submit the declaration, and provide a Certificate of Analysis or Certificate of Conformance from a competent laboratory, preferably in the exporting country. Without it the consignment does not clear until samples are drawn and tested. That registration is not nominal: GSA's fee scale for importers runs from $20 to $4,000 a year depending on what you import, and it is charged on the Ghana side of the transaction, not to your supplier.

The scheme that produces it is EasyPASS. Bureau Veritas is appointed by GSA to verify conformity in the region of export and prior to shipment, and Intertek is also approved. Ignore advice pointing at G-CAP: a public notice deferred its 1 October 2014 start and it never became the operating programme. On 1 July 2026 the Authority directed importers, exporters, agents and forwarders to apply directly to GSA. Three routes exist: A for any good and any trader, where a first shipment belongs; B for goods already registered by Bureau Veritas; C for goods already licensed.

Which EasyPASS route a PP-R consignment takes, and where every route endsPP-R consignment booked for TemaHave these exact SKUs already been throughthe GSA-appointed verification body?Route ANo, or first shipmentAny good, any trader.Verified consignmentby consignment.Route BRegistrationGoods alreadyregistered by theappointed body.Route CLicensingGoods alreadylicensed by theappointed body.Certificate of Conformity issued in the region of export,prior to shipmentCertificate reference lodged with the ICUMS declaration at Tema
The routes differ only in what the appointed body already holds on file; every one of them ends at the same document, issued before loading. Built from GSA’s own EasyPASS flyer (routes and regulated categories), GSA’s 1 July 2026 directive (applications now go directly to the Authority) and Bureau Veritas’s Ghana programme page (verification in the region of export, prior to shipment), all read 4 September 2026.

The Standard Your Certificate Has to Name

GSA tells importers to buy the applicable Ghana Standard, and for PP-R that is harder than it sounds. We downloaded the 4.9 MB Catalogue of Ghana Standards 2019 on 4 September 2026 and searched the full text. PVC-U pressure pipe is there in five parts, adopted identically from ISO 1452; polypropylene appears only as woven sacks, oriented film, an additive protocol and a test method.

Pressure-pipe standards in the Catalogue of Ghana Standards 2019, checked 4 September 2026
MaterialIn the 2019 catalogueWhat a certificate can cite
PVC-U pressure pipeGS ISO 1452-1:2009, -2:2015, -3:2015, -4:2012, -5:2015The GS number itself, identical adoption of ISO 1452
PP-R hot and cold water pipeNo adopted standard foundISO 15874-2:2013 with AMD 1:2018 and AMD 2:2022, or DIN 8077/8078
PP-R, GSA work programmeListed as new work, stage 90.20, target 2020-06-30No designation issued, so nothing to cite yet

Source: Catalogue of Ghana Standards 2019 (GSA) and the GSA standards work programme bulletin, both read 4 September 2026.

Do not push that finding too far: it is the position in the catalogue GSA publishes openly, not proof that no Ghana standard exists today. Ask GSA in writing which standard your consignment will be assessed against. Where no national standard exists the certificate leans on the international one, so cite that precisely. ISO 15874-2 is Edition 2, published 13 February 2013, confirmed on review in February 2023, amended in 2018 and again in 2022 for impact testing, and at stage 90.92 for revision since 5 May 2025. A report citing only “ISO 15874”, with no year and no amendment, invites the query you were trying to avoid.

Our own pipe is made to DIN 8077/8078 and ISO 15874, in PN12.5 to PN25, with batch certificates issued per shipment. That is the form a verification body expects: a named standard, a named edition, and a document tied to the production run rather than to the company.

Green PP-R pipe lengths in several diameters with printed marking lines reading PP-R PIPE with pressure class PN20 and PN25 and nominal diameters with wall thickness
What the pipe itself tells an inspector: material, pressure class, nominal diameter and wall thickness. No standard designation is legible in this frame — that reference has to arrive on the test report and the certificate, which is why the edition and amendment you cite carry the file.

The Tema Clearance Sequence, Step by Step

Ghana clears through ICUMS, the Integrated Customs Management System, and the Ghana Revenue Authority publishes the order. Before arrival you need the original waybill or bill of lading, an attested invoice, the packing list, an Import Declaration Form from the Ministry of Trade, a TIN or GhanaCard PIN, and, in GRA's words, required permits from any of the regulatory agencies depending on the goods. That last clause is where the GSA document attaches, and it is what strands containers.

Give your clearing agent the certificate reference when you hand over the bill of lading, not after the declaration is queried. ICUMS runs classification, valuation and approval as one pass, and a declaration re-opened for a missing permit goes back to the start of that queue: days, not hours, on a red-channel consignment.

The ICUMS import sequence as stated by GRA, with the conformity document mapped onto it
StageWho actsWhat stops it
Conformity verification at originExporter and the GSA-appointed bodyBooking the vessel before the inspection is scheduled
Declaration lodged in ICUMSClearing agentMissing IDF, TIN or regulatory permit
Classification, valuation, approvalCustomsInvoice and packing list that disagree
Duties and taxes paidImporter, at participating banksA tariff line queried after valuation
Examination officer selectedICUMS, by risk channelRed channel means mandatory physical examination
Destination inspection and samplingGSA officersNo CoA or CoC, so samples go for testing
Release and exit gateCustoms and terminalSecurity check and terminal evacuation queues

Source: GRA import procedures and GSA import inspection pages, read 4 September 2026.

Understand the risk channel before promising a delivery date: red means mandatory physical examination, yellow a digital scan, green release at the gate. A first-time importer of a regulated category is not the profile that draws green. Our import documents checklist covers the commercial half of the pack; the Nigerian SONCAP route shows how differently a neighbour behaves.

Two officials in high-visibility vests and hard hats examining stacked green plastic pressure pipe inside an opened shipping container at a terminal
Red channel means the container is opened and examined before release. The certificate reference sitting on the declaration is what keeps that examination to paperwork instead of drawn samples and a laboratory queue.

What It Costs to Land PP-R in Ghana in 2026

Two changes took effect on 1 January 2026, and between them they date most of what is written online about importing into Ghana. The Value Added Tax Act, 2025 (Act 1151) came into force. The COVID-19 Health Recovery Levy Repeal Act, assented 10 December 2025, removed the 1% levy carried on nearly every landed-cost sheet published before this year.

Ghana import charge stack for plastic pressure pipe, position as at September 2026
ChargeRate (%, or as stated)Source and date
Import duty, ECOWAS CET bandOne of 0, 5, 10, 20 or 35; read your own lineGRA customs tariffs and levies, 2026
VAT, standard rate15VAT Act, 2025 (Act 1151), from 1 January 2026
COVID-19 Health Recovery LevyRepealedRepeal Act assented 10 December 2025
EasyPASS verification fee0.35 to 0.50 of FOB valueUS Commerce country commercial guide, Ghana
GSA importer registration, annualUSD 20 to USD 4,000 by product typeUS Commerce country commercial guide, Ghana

Notice what is missing: a duty percentage for your pipe. PP-R classifies in HS heading 3917, subheading 3917.22 for rigid tubes of polymers of propylene, but GRA publishes the five CET bands without saying which band a national tariff line sits in. Guessing between the 10% and 20% bands moves a container's duty bill by thousands of dollars, so read your own line off ICUMS. GSA states the EasyPASS charges are borne by exporters and manufacturers abroad as an integrated cost of production or certification at origin. That describes the incidence, not a term in your contract, and under FOB you negotiate it, which is why the FOB versus CIF choice matters more here than in an unregulated category.

Where Ghana Shipments Actually Stall

The first failure is documentary and absolute: without a CoA or CoC the consignment does not clear until samples are drawn and tested, and the testing clock does not care that the certificate was late rather than absent. The second is the risk rating. Destination inspection covers labels and random sampling, so labelling that disagrees with the declaration is what turns a routine consignment into a sampled one, and a sampled DN110 bundle is tested against the same standard the certificate should already have named.

The third has nothing to do with your paperwork. At the Ghana Shippers' Authority second-quarter meeting reported on 1 July 2026, shippers said containers designated for inland depots often remained at MPS Terminal 3 for weeks before transfer, with charges accruing throughout. No free-day count or ground-rent tariff was published with that report, so we will not invent one.

Rows of stacked shipping containers in a terminal storage yard at dusk with a line of trucks waiting at the exit gate
Dwell is the failure mode no document prevents. The Ghana Shippers’ Authority reported at its second-quarter meeting that containers often sat at MPS Terminal 3 for weeks before transfer, and published no free-day or rent figure — so this is a date you protect in the contract, not a cost you can model.

Underneath it sits the Ghana Standards Authority Act, 2022 (Act 1078), assented 10 June 2022: s.3(2)(b)(v) lets the Authority prohibit importation of non-conforming goods, s.44(3) lets an inspector stop, seize and detain, and s.65(1) sets the general offence at 2,000 to 4,000 penalty units, 6 to 12 months' imprisonment, or both.

What to Put in Your Supplier's Hands

A certificate application is built from the consignment, not the factory's reputation. The exporter needs the shipment described as it will appear on the invoice: the SKU list with diameter and pressure class on every line, the material grade and the colour. Add the test reports citing the standard with its year and amendments, and the batch certificates for the production run. A certificate issued against “PPR pipe and fittings” will not survive an examination that finds DN110 in a container declared DN20 to DN63. Our range runs DN20 to DN160 in PN12.5 to PN25 and mixed-size containers are normal, so the enumeration has to be exact.

Settle the route in the same conversation, then test the claim behind it, because no factory holds a standing Ghana Certificate of Conformity. It is issued per consignment by the appointed body, against the goods on that invoice, after verification in the country of export. A supplier claiming permanent Ghana certification is describing a product registration or a lab report. Ask which appointed body, which route, which consignment. For the commercial side of this decision see our guide to choosing a PPR supplier for Ghana and West Africa, and the PPR supplier page lists the export documentation that ships with a container.

Gloved hands closing a digital caliper on the wall of a cut green PP-R pipe on a workbench beside a blank sample tag, with strapped bundles of pipe behind
This measurement is the event a Certificate of Conformity records, and it happens at the factory before loading. Settle in advance who attends, which SKUs are sampled, and which standard and edition the report will name.
Shipping PP-R to Tema? Send us the SKU list.

For importers and distributors buying PP-R by the container into Ghana, at 1-container MOQ.

Get a quote with export documents

Conclusion

Ghana is a market where a document has to exist before the pipe moves, and where the standard it names is not the obvious one. Settle three things in writing before confirming the order: which body verifies, which standard and edition the report cites, and which route the goods qualify for. Budget the verification at 0.35% to 0.50% of FOB and your own GSA registration at $20 to $4,000 a year. Then send the diameters and pressure classes you are planning, anywhere in DN20 to DN160 and PN12.5 to PN25, and we will come back with the pricing and the document set together.

Written by the PPR technical team at IFAN Group, the group's technical and export team.

Reviewed 4 September 2026. Profile

Frequently Asked Questions

Does PP-R pipe need a Certificate of Conformity for Ghana?

Plan on it. Construction materials are a regulated EasyPASS category and GSA's procedure requires a CoA or CoC with the consignment. The programme lists categories, not HS codes, so confirm classification with the appointed body.

Can I get the certificate after the container reaches Tema?

No. Bureau Veritas verifies in the region of export, prior to shipment, so the inspection it records must have happened before loading. Arriving without it means samples are drawn and tested first.

Which standard should the test report cite for PP-R?

ISO 15874-2:2013 with Amendment 1:2018 and Amendment 2:2022, or DIN 8077/8078. The Catalogue of Ghana Standards 2019 lists no adopted PP-R standard, so the international reference carries the file.

Is the COVID-19 levy still charged on Ghanaian imports?

No. The Repeal Act was assented 10 December 2025 and took effect with the VAT Act, 2025 (Act 1151) on 1 January 2026. Cost sheets showing the 1% line are out of date.