How to Match a Lead-Free Valve Quote to Its Exact Listing

Check a valve quotation against the exact model, outlet, factory and NSF listing. Follow a Q1-to-Q2 example without releasing unresolved purchase checks.
In the fictional V-01 enquiry below, quote Q1 offers EFFNU-01-LF with an NPT outlet where the drawing calls for sweat. Changing Q2 to EFFCU-01-LF closes that connection discrepancy only. V-01 stays on hold until the offered factory, applicable NSF 61/372 evidence and certification marks, CLD 23 water-contact duty, pressure rating and project approvals are documented.
The two E.F.F. references are real products; V-01 and the quotation revisions are an illustrative purchasing exercise. Keep one marked schedule from Q1 to Q2 so that a corrected outlet cannot silently inherit approvals for the rest of the order. The register below shows which field closes, which checks remain open and who must supply the next answer.
Key takeaways
- Q1’s NPT outlet conflicts with the illustrative sweat requirement.
- Q2’s corrected sweat model closes the connection field only.
- Confirm the offered factory and applicable 61/372 listing and marks.
- Keep CLD 23 duty, engineering pressure and project acceptance separate.
- Hold V-01 until the remaining release checks are documented.

Separate the two questions on the submittal
NSF explains that Standard 372 addresses lead content, whereas extraction or leaching requirements are a separate consideration. For a buyer, that means a content claim does not answer every drinking-water acceptance question. Request the evidence specified for the actual application instead of treating all certification references as interchangeable.
The City of Thornton’s June 2025 process-valve bid specification provides a real example of that separation. Section 40 05 51 lists both NSF 61 and NSF 372 and also calls for manufacturer literature and specified submittals. Take the evidence columns from your own contract. The Thornton project helps explain the workflow and does not identify the small ball valve used in the separate illustration below.
Build a match that survives a quotation revision
Ask the supplier for the manufacturer’s legal name, exact model or series, size, connection and any suffix that distinguishes the offered variant. Obtain the certification body’s name and a direct listing reference. Keep the quotation revision alongside the listing record so that an amended offer cannot silently inherit an earlier product check.
The EPA guide to identifying lead-free certification marks directs readers toward product information, the certifier’s directory or the certification body when a mark needs clarification. It is a useful verification route; it is not a certificate for the valve on your desk.
Read the limitations as carefully as the product name. Record the sizes and variants actually covered, and ask the certifier about an unclear scope. Save the date of your check. A screenshot without the directory address or product identity is difficult for a colleague to verify later.
Work one row from the quote to the issuer directory
Consider a fictional building schedule specifying a half-inch PEX expansion inlet, a half-inch sweat outlet and evidence for both health effects and lead content. A supplier instead quotes EFFNU-01-LF. In its E.F.F. issuer listing snapshot under Standard 61, NSF identifies that reference with a half-inch NPT end. The adjacent range also lists EFFCU-01-LF, which is described with a half-inch sweat end. The manufacturer’s catalogue identifies that model as the F1960 expansion-to-sweat variant. Record the directory’s water-contact temperature field as printed and resolve its scope for the intended duty. The valve group carries [G], whose footnote identifies certification to Standard 372. The issuer index states that its data are current as of November 19, 2026, 12:15 a.m. Eastern Time. Both references sit inside E.F.F.’s Valves[G] groups for its listed Zhejiang and Chonburi facilities; use the offered product’s applicable facility record. Before order release, ask the supplier to confirm the exact model, production facility and applicable listing for the offered product.
| Required check | Evidence on the offered EFFNU-01-LF | Working disposition |
|---|---|---|
| Exact product identity and size | Directory description identifies the offered half-inch expansion and half-inch NPT variant. | Record the identity match. Continue checking the specified duty. |
| Half-inch sweat outlet | The NPT listing description conflicts with the drawing. The directory and catalogue identify a separate sweat model. | Hold the line. Request a corrected model on the quotation or obtain designer disposition. |
| Required 61 and 372 evidence and water-contact conditions | The exact listing and its applicable footnotes are the starting evidence. The listing displays CLD 23 for these entries. | Have the responsible reviewer check both standards and the temperature condition for the revised offer before release. |
Keep the original offer and the corrected one side by side. A corrected outlet can solve the connection discrepancy while leaving pressure rating, documented water-contact conditions or project acceptance open. Record each decision separately.

Keep the same line number when the offer changes
The following filled register continues the fictional half-inch building enquiry above. Its drawing requirement, quote revisions and assigned roles are illustrative; the two E.F.F. model references are real. It is separate from the Thornton treatment-plant contract. Give this record to the buyer with the marked quotation, rather than sending a certificate PDF on its own.
| Record | Offered reference | Evidence and decision | Next owner |
|---|---|---|---|
| Drawing V-01 | Half-inch expansion inlet; sweat outlet | Requires both certification checks; pressure and duty need confirmation. | Designer defines duty. |
| Quote Q1 | EFFNU-01-LF | NPT outlet conflicts. Hold V-01; request a corrected quote. | Supplier revises model. |
| Quote Q2, illustrative correction | EFFCU-01-LF | Sweat outlet agrees with drawing and catalogue. Connection discrepancy closed. | Buyer attaches Q2 and catalogue page. |
| Q2 certification review | Same EFFCU-01-LF | Model appears under both factory groups. Confirm offered factory, applicable listing and marks, plus CLD 23 duty. | Responsible reviewer verifies issuer scope. |
| Q2 order release | V-01 / Q2 reference retained | Pressure, duty and commercial milestones remain pending. No release recorded. | Buyer obtains remaining approvals. |
Archive Q1 as superseded for this line; do not overwrite it. Attach Q2, the drawing revision, the issuer URL and access date, the page’s own status date, the catalogue page and the reviewer’s disposition. If the supplier later adds a drain suffix or changes a connection, reopen the affected checks against that exact reference. Keep valid unchanged evidence only after confirming that it still covers the revised offer.
The release note should identify who accepted the design duty and which quotation revision purchasing may order. A connection match does not settle water-contact conditions, and a water-contact certification does not supply an engineering pressure rating. Use the IFAN brass-valve pressure and temperature guide to frame the separate rating enquiry, then obtain the exact offered valve’s pressure-temperature evidence for the specified medium and duty. An unresolved CLD 23 condition stays visible to the reviewer rather than becoming a guessed hot-water approval.

Ask for a purchasable, traceable offer
IFAN Holding lists brass valves in its wholesale product range. For an offered-model enquiry, send the intended market, service, project specification, sizes and connection schedule. Request an offered-model schedule with its supporting documents. The E.F.F. listings above apply to the named third-party products. Ask separately for the evidence covering any actual IFAN offer.
Ask for MOQ by model and size, sample availability, production lead time after specification approval and which event starts that lead time. Separate the sample review date from the required dispatch date. If documentation must arrive before purchase-order release, put that milestone into the enquiry so a cheap quotation does not become an unusable schedule.

Conclusion
Keep V-01 tied to the accepted quotation revision. Q2 closes the sweat-outlet discrepancy only; keep the line on hold until the responsible reviewers document the remaining certification, duty, pressure and project approvals.
FAQ
Does the word “lead-free” mean zero lead?
Do not interpret marketing wording as an absolute composition statement. Check the applicable standard and the product’s actual certified claim.
Can another valve in the same series be substituted?
Only after checking the offered variant against the listing and project requirements. Request the revised model identity before closing the submittal.
What should I send first?
Send the valve schedule and the project’s required evidence list. Ask the supplier to return one marked schedule linking each offered reference to its supporting document.
By IFAN Group. Public-source purchasing explanation; V-01 and Q1/Q2 are illustrative, not an actual IFAN quotation or certification.